Assessment Year | 2000 |
---|---|
Principal Product | dairy products |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
80,000
ft2
|
Annual Production | 250,000,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $222,863 | 9,396,249 |
kWh
|
$0.024 |
Electricity Demand | $129,830 | 18,444 |
kW-mo/yr
|
$7.04 |
Natural Gas | $95,658 | 34,205 |
MMBtu
|
$2.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $104,433 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,891 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $2,486 | $2,487 |
$1,678
71,805
kWh
|
$808
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,923 | $1,921 |
$1,297
55,393
kWh
|
$626
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,422 | $1,421 |
$957
41,032
kWh
|
$465
-
kW-mo/yr
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,856 | $2,855 |
$1,927
82,356
kWh
|
$929
-
kW-mo/yr
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,132 | $2,132 |
$1,015
43,083
kWh
|
$1,117
-
kW-mo/yr
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $909 | $775 |
$613
26,084
kWh
|
$296
-
kW-mo/yr
|
- | - | |
07 | 2.7135: Install occupancy sensors | $488 | $488 |
$488
20,809
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $649 | $374 |
$438
18,757
kWh
|
$211
-
kW-mo/yr
|
- | - | |
09 | 2.1213: Direct warmest air to combustion intake | $617 | $617 | - | - |
$617
-
MMBtu
|
- | |
10 | 4.441: Install automatic packing equipment | $88,850 | $88,849 |
$(-584.0)
(-4,982)
kWh
|
$(-422.0)
-
kW-mo/yr
|
- | $89,856 | |
11 | 4.122: Develop standard procedures to improve internal yields | $2,101 | $2,101 | - | - | - | $2,101 | |
TOTAL RECOMMENDED | $104,433 | $104,020 |
$7,829
354,337
kWh
|
$4,030
-
kW-mo/yr
|
$617
-
MMBtu
|
$91,957 | ||
TOTAL IMPLEMENTED | $9,891 | $9,478 |
$6,247
266,705
kWh
|
$3,644
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs