Assessment Year | 2000 |
---|---|
Principal Product | precast concrete forms |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 260 |
Plant Area |
2,178,000
ft2
|
Annual Production | 60,000
units
|
Production Hrs. Annual | 3,900
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,081 | 1,598,769 |
kWh
|
$0.030 |
Electricity Demand | $26,031 | 5,412 |
kW-mo/yr
|
$4.81 |
Natural Gas | $90,677 | 18,374 |
MMBtu
|
$4.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,409 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,400 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,095 | $734 |
$6,125
199,590
kWh
|
$2,970
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $585 | $200 |
$393
12,896
kWh
|
$192
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $943 | $75 |
$635
20,809
kWh
|
$308
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,065 | $2,565 |
$647
21,102
kWh
|
$418
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $567 | $1,670 |
$567
18,464
kWh
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $434 | - |
$419
13,775
kWh
|
$203
-
kW-mo/yr
|
$(-188.0) | - | |
07 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $720 | - | - | - | - | $720 | |
TOTAL RECOMMENDED | $13,409 | $5,244 |
$8,786
286,636
kWh
|
$4,091
-
kW-mo/yr
|
$(-188.0) | $720 | ||
TOTAL IMPLEMENTED | $10,400 | $934 |
$6,518
212,486
kWh
|
$3,162
-
kW-mo/yr
|
- | $720 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs