ITAC Assessment: MI0082
ITAC logo
ITAC Assessment: MI0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Acoustic panels
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 137,800
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 1,700
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,301 2,016,360
kWh
Electricity Demand $54,099 6,632
kW-mo/yr
Electricity Fees $18,262 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,667

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $10,443 $96,600 - - $10,443
02 2.6218: Turn off equipment when not in use $10,385 $2,300 $10,385
187,313
kWh
- -
03 4.445: Install equipment to move product $47,434 $41,672 $(-1,783.0)
(-35,847)
kWh
$49,217 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,282 $2,670 $4,282
86,009
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,313 $13,803 $8,313
166,994
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $1,241 $610 $1,241
24,997
kWh
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,594 $40 - - $9,594
TOTAL RECOMMENDED $91,692 $157,695 $22,438
429,466
kWh
$49,217 $20,037
TOTAL IMPLEMENTED $14,667 $4,970 $14,667
273,322
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs