| Assessment Year | 2004 |
|---|---|
| Principal Product | Acoustic panels |
| NAICS | 332321: Metal Window and Door Manufacturing |
| SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
137,800
ft2
|
| Annual Production | 4,000
pieces
|
| Production Hrs. Annual | 1,700
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $94,301 | 2,016,360 |
kWh
|
$0.047 |
| Electricity Demand | $54,099 | 6,632 |
kW-mo/yr
|
$8.16 |
| Electricity Fees | $18,262 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $91,692 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,667 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $10,443 | $96,600 | - | - | $10,443 | |
| 02 | 2.6218: Turn off equipment when not in use | $10,385 | $2,300 |
$10,385
187,313
kWh
|
- | - | |
| 03 | 4.445: Install equipment to move product | $47,434 | $41,672 |
$(-1,783.0)
(-35,847)
kWh
|
$49,217 | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,282 | $2,670 |
$4,282
86,009
kWh
|
- | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,313 | $13,803 |
$8,313
166,994
kWh
|
- | - | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $1,241 | $610 |
$1,241
24,997
kWh
|
- | - | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,594 | $40 | - | - | $9,594 | |
| TOTAL RECOMMENDED | $91,692 | $157,695 |
$22,438
429,466
kWh
|
$49,217 | $20,037 | ||
| TOTAL IMPLEMENTED | $14,667 | $4,970 |
$14,667
273,322
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs