Assessment Year | 2000 |
---|---|
Principal Product | molded thermoplastic parts |
NAICS |
n/a
|
SIC | 3083: Laminated Plastics Plate, Sheet, and Profile Shapes |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
40,000
ft2
|
Annual Production | 1,200
ton
|
Production Hrs. Annual | 4,600
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $128,107 | 2,058,031 |
kWh
|
$0.062 |
Electricity Demand | $47,453 | 6,324 |
kW-mo/yr
|
$7.50 |
Natural Gas | $1,416 | 283 |
MMBtu
|
$5.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $105,174 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $98,489 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,446 | - |
$2,007
64,771
kWh
|
$1,439
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,424 | $3,164 |
$734
23,740
kWh
|
$690
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $791 | - |
$485
15,533
kWh
|
$306
-
kW-mo/yr
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $186 | $25 |
$114
3,810
kWh
|
$72
-
kW-mo/yr
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $142 | $335 |
$88
2,931
kWh
|
$54
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $114 | $113 |
$70
2,345
kWh
|
$44
-
kW-mo/yr
|
- | - | - | |
07 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $97,398 | $100,000 |
$(-1,558.0)
(-50,117)
kWh
|
$(-6,025.0)
-
kW-mo/yr
|
$104,981
-
lb
|
- | - | |
08 | 4.221: Use only amount of packaging material necessary | $1,500 | $6,500 | - | - | - | $1,500 | - | |
09 | 4.211: Consider use / purchase of bulk materials where possible | $173 | - | - | - | - | - | $173 | |
TOTAL RECOMMENDED | $105,174 | $110,137 |
$1,940
63,013
kWh
|
$(-3,420.0)
-
kW-mo/yr
|
$104,981
-
lb
|
$1,500 | $173 | ||
TOTAL IMPLEMENTED | $98,489 | $100,138 |
$(-889.0)
(-28,429)
kWh
|
$(-5,603.0)
-
kW-mo/yr
|
$104,981
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs