ITAC Assessment: IA0245
ITAC logo
ITAC Assessment: IA0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product molded thermoplastic parts
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 1,200
ton
Production Hrs. Annual 4,600
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,107 2,058,031
kWh
Electricity Demand $47,453 6,324
kW-mo/yr
Natural Gas $1,416 283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $98,489

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $3,446 - $2,007
64,771
kWh
$1,439
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,424 $3,164 $734
23,740
kWh
$690
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $791 - $485
15,533
kWh
$306
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $186 $25 $114
3,810
kWh
$72
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $142 $335 $88
2,931
kWh
$54
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $114 $113 $70
2,345
kWh
$44
-
kW-mo/yr
- - -
07 3.5212: Regrind, reuse, or sell scrap plastic parts $97,398 $100,000 $(-1,558.0)
(-50,117)
kWh
$(-6,025.0)
-
kW-mo/yr
$104,981
-
lb
- -
08 4.221: Use only amount of packaging material necessary $1,500 $6,500 - - - $1,500 -
09 4.211: Consider use / purchase of bulk materials where possible $173 - - - - - $173
TOTAL RECOMMENDED $105,174 $110,137 $1,940
63,013
kWh
$(-3,420.0)
-
kW-mo/yr
$104,981
-
lb
$1,500 $173
TOTAL IMPLEMENTED $98,489 $100,138 $(-889.0)
(-28,429)
kWh
$(-5,603.0)
-
kW-mo/yr
$104,981
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings