Assessment Year | 2000 |
---|---|
Principal Product | oxygen impermeable plastic food bags |
NAICS |
n/a
|
SIC | 2673: Plastics, Foil, and Coated Paper Bags |
Sales Range | $100 M to 500M |
# of Employees | 430 |
Plant Area |
250,000
ft2
|
Annual Production | 55,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $803,457 | 37,287,515 |
kWh
|
$0.022 |
Electricity Demand | $22,209 | 56,388 |
kW-mo/yr
|
$0.39 |
Natural Gas | $15,310 | 5,230 |
MMBtu
|
$2.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $181,569 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,552 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,172 | $1,104 |
$5,471
254,396
kWh
|
$1,701
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $15,055 | - |
$11,479
533,998
kWh
|
$3,576
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,987 | $2,000 | - | - |
$1,987
-
MMBtu
|
- | - | - | |
04 | 2.1213: Direct warmest air to combustion intake | $1,474 | $1,474 | - | - |
$1,474
-
MMBtu
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,325 | $39,789 |
$12,255
570,047
kWh
|
$4,070
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,574 | - |
$1,199
55,686
kWh
|
$375
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7135: Install occupancy sensors | $213 | $466 |
$213
9,965
kWh
|
- | - | - | - | - | |
08 | 3.8142: Distill contaminated solvents for reuse | $94,641 | $36,700 | - | - | - |
$94,641
-
gal
|
- | - | |
09 | 4.231: Purchase equipment instead of leasing | $2,750 | $7,900 | - | - | - | - |
$2,750
-
lb
|
- | |
10 | 2.8113: Purchase gas directly from a contract gas supplier | $34,515 | $2,950 | - | - | - | - | - | $34,515 | |
11 | 2.8112: Combine utility meters | $5,863 | $100 | - | - | - | - | - | $5,863 | |
TOTAL RECOMMENDED | $181,569 | $92,483 |
$30,617
1,424,092
kWh
|
$9,722
-
kW-mo/yr
|
$3,461
-
MMBtu
|
$94,641
-
gal
|
$2,750
-
lb
|
$40,378 | ||
TOTAL IMPLEMENTED | $38,552 | $40,893 |
$29,205
1,358,441
kWh
|
$9,347
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs