ITAC Assessment: IA0241
ITAC logo
ITAC Assessment: IA0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product oxygen impermeable plastic food bags
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $100
M
to 500
M
# of Employees 430
Plant Area 250,000
ft2
Annual Production 55,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $803,457 37,287,515
kWh
Electricity Demand $22,209 56,388
kW-mo/yr
Natural Gas $15,310 5,230
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $181,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,552

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,172 $1,104 $5,471
254,396
kWh
$1,701
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $15,055 - $11,479
533,998
kWh
$3,576
-
kW-mo/yr
- - - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,987 $2,000 - - $1,987
-
MMBtu
- - -
04 2.1213: Direct warmest air to combustion intake $1,474 $1,474 - - $1,474
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $16,325 $39,789 $12,255
570,047
kWh
$4,070
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,574 - $1,199
55,686
kWh
$375
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $213 $466 $213
9,965
kWh
- - - - -
08 3.8142: Distill contaminated solvents for reuse $94,641 $36,700 - - - $94,641
-
gal
- -
09 4.231: Purchase equipment instead of leasing $2,750 $7,900 - - - - $2,750
-
lb
-
10 2.8113: Purchase gas directly from a contract gas supplier $34,515 $2,950 - - - - - $34,515
11 2.8112: Combine utility meters $5,863 $100 - - - - - $5,863
TOTAL RECOMMENDED $181,569 $92,483 $30,617
1,424,092
kWh
$9,722
-
kW-mo/yr
$3,461
-
MMBtu
$94,641
-
gal
$2,750
-
lb
$40,378
TOTAL IMPLEMENTED $38,552 $40,893 $29,205
1,358,441
kWh
$9,347
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings