ITAC Assessment: OK0314
ITAC logo
ITAC Assessment: OK0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product AEROSTRUCTURES
NAICS
n/a
SIC 3721: Aircraft
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,100
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,813 13,611,958
kWh
Natural Gas $56,882 21,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,637

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $10,575 $18,500 - $10,575
-
MMBtu
02 2.2514: Cover open tanks $7,010 $2,397 $3,553
150,938
kWh
$3,457
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,838 - $4,838
137,749
kWh
-
04 2.4133: Use most efficient type of electric motors $630 $832 $630
26,964
kWh
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,578 $4,400 $3,578
-
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $594 - $594
27,257
kWh
-
TOTAL RECOMMENDED $27,225 $26,129 $13,193
342,908
kWh
$14,032
-
MMBtu
TOTAL IMPLEMENTED $16,637 $19,332 $6,062
191,970
kWh
$10,575
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs