Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product toothbrushes
NAICS
n/a
SIC 3843: Dental Equipment and Supplies
Sales Range $100
M
to 500
M
# of Employees 800
Plant Area 325,000
ft2
Annual Production 325,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,369,352 30,031,360
kWh
Natural Gas $36,580 9,879
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,330 - $5,330
171,161
kWh
02 2.4133: Use most efficient type of electric motors $5,222 - $5,222
129,836
kWh
03 2.4221: Install compressor air intakes in coolest locations $4,996 $463 $4,996
109,613
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,204 $100 $4,204
92,321
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,648 $623 $3,648
80,012
kWh
TOTAL RECOMMENDED $23,400 $1,186 $23,400
582,943
kWh
TOTAL IMPLEMENTED $23,400 $1,186 $23,400
582,943
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs