Assessment Year | 1999 |
---|---|
Principal Product | truck bodies, hoists |
NAICS |
n/a
|
SIC | 3713: Truck and Bus Bodies |
Sales Range | $10 M to 50M |
# of Employees | 260 |
Plant Area |
500,000
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 4,550
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $149,897 | 3,114,009 |
kWh
|
$0.048 |
Electricity Demand | $43,127 | 12,456 |
kW-mo/yr
|
$3.46 |
Natural Gas | $90,124 | 20,947 |
MMBtu
|
$4.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $235,651 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,718 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,704 | $13,064 |
$3,357
90,270
kWh
|
$2,347
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,087 | $445 |
$1,151
36,049
kWh
|
$936
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,827 | $537 |
$1,058
28,429
kWh
|
$769
-
kW-mo/yr
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $704 | $828 |
$395
10,844
kWh
|
$309
-
kW-mo/yr
|
- | - | - | |
05 | 3.2121: Convert to electrostatic powder coating | $150,000 | $28,000 | - | - | - | - | $150,000 | |
06 | 3.8143: Recycle cleaning solvent and reuse | $33,891 | $10,300 | - |
$(-241.0)
-
kW-mo/yr
|
$13,942
-
gal
|
$(-4,830.0) | $25,020 | |
07 | 3.2161: Closely monitor chemical additions to increase bath life | $9,540 | $16,088 | - | - | - | - | $9,540 | |
08 | 4.423: Move product using mechanical means | $31,898 | $175,500 | - | - | - | $31,898 | - | |
TOTAL RECOMMENDED | $235,651 | $244,762 |
$5,961
165,592
kWh
|
$4,120
-
kW-mo/yr
|
$13,942
-
gal
|
$27,068 | $184,560 | ||
TOTAL IMPLEMENTED | $35,718 | $10,837 |
$1,058
28,429
kWh
|
$528
-
kW-mo/yr
|
$13,942
-
gal
|
$(-4,830.0) | $25,020 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs