ITAC Assessment: IA0223
ITAC logo
ITAC Assessment: IA0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product vending machines
NAICS
n/a
SIC 3581: Automatic Vending Machines
Sales Range $50
M
to 100
M
# of Employees 425
Plant Area 375,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 7,056
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,409 4,087,339
kWh
Electricity Demand $79,016 11,352
kW-mo/yr
Natural Gas $106,250 21,802
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $146,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $9,307 $2,670 n/a $(-55.0)
(-1,465)
kWh
- $9,362
-
MMBtu
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,129 $275 n/a $1,319
50,410
kWh
$810
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,841 - n/a $671
25,791
kWh
$1,170
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $1,282 $653 n/a $797
30,481
kWh
$485
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $741 $50 n/a $460
17,585
kWh
$281
-
kW-mo/yr
- - - -
06 2.7135: Install occupancy sensors $144 $732 n/a $144
5,569
kWh
- - - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $17,424 $7,400 n/a - - - $17,424
-
lb
- -
08 4.322: Eliminate old stock and modify inventory control $70,029 $25,372 n/a - - - - $70,029 -
09 4.514: Re-arrange equipment layout to reduce handling costs $40,016 $218 n/a - - - - $40,016 -
10 4.211: Consider use / purchase of bulk materials where possible $3,779 $1,400 n/a - - - - - $3,779
TOTAL RECOMMENDED $146,692 $38,770 $3,336
128,371
kWh
$2,746
-
kW-mo/yr
$9,362
-
MMBtu
$17,424
-
lb
$110,045 $3,779
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs