Assessment Year | 1999 |
---|---|
Principal Product | vending machines |
NAICS |
n/a
|
SIC | 3581: Automatic Vending Machines |
Sales Range | $50 M to 100M |
# of Employees | 425 |
Plant Area |
375,000
ft2
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 7,056
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,409 | 4,087,339 |
kWh
|
$0.027 |
Electricity Demand | $79,016 | 11,352 |
kW-mo/yr
|
$6.96 |
Natural Gas | $106,250 | 21,802 |
MMBtu
|
$4.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $146,692 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $9,307 | $2,670 | n/a |
$(-55.0)
(-1,465)
kWh
|
- |
$9,362
-
MMBtu
|
- | - | - |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,129 | $275 | n/a |
$1,319
50,410
kWh
|
$810
-
kW-mo/yr
|
- | - | - | - |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,841 | - | n/a |
$671
25,791
kWh
|
$1,170
-
kW-mo/yr
|
- | - | - | - |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,282 | $653 | n/a |
$797
30,481
kWh
|
$485
-
kW-mo/yr
|
- | - | - | - |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $741 | $50 | n/a |
$460
17,585
kWh
|
$281
-
kW-mo/yr
|
- | - | - | - |
06 | 2.7135: Install occupancy sensors | $144 | $732 | n/a |
$144
5,569
kWh
|
- | - | - | - | - |
07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $17,424 | $7,400 | n/a | - | - | - |
$17,424
-
lb
|
- | - |
08 | 4.322: Eliminate old stock and modify inventory control | $70,029 | $25,372 | n/a | - | - | - | - | $70,029 | - |
09 | 4.514: Re-arrange equipment layout to reduce handling costs | $40,016 | $218 | n/a | - | - | - | - | $40,016 | - |
10 | 4.211: Consider use / purchase of bulk materials where possible | $3,779 | $1,400 | n/a | - | - | - | - | - | $3,779 |
TOTAL RECOMMENDED | $146,692 | $38,770 |
$3,336
128,371
kWh
|
$2,746
-
kW-mo/yr
|
$9,362
-
MMBtu
|
$17,424
-
lb
|
$110,045 | $3,779 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs