Assessment Year | 1999 |
---|---|
Principal Product | stamped metal parts |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
87,000
ft2
|
Annual Production | 734,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,409 | 4,087,339 |
kWh
|
$0.027 |
Electricity Demand | $79,016 | 11,352 |
kW-mo/yr
|
$6.96 |
Natural Gas | $106,250 | 21,802 |
MMBtu
|
$4.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,334 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,776 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,918 | $11,267 |
$3,292
123,681
kWh
|
$1,626
-
kW-mo/yr
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $7,470 | - |
$5,056
190,211
kWh
|
$2,414
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,245 | $288 |
$836
31,360
kWh
|
$409
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $563 | $245 |
$379
14,361
kWh
|
$184
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $960 | - |
$650
24,326
kWh
|
$310
-
kW-mo/yr
|
- | |
06 | 2.8113: Purchase gas directly from a contract gas supplier | $25,571 | $2,950 | - | - | $25,571 | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $21,965 | $59,400 | - |
$17,435
-
kW-mo/yr
|
$4,530 | |
08 | 4.514: Re-arrange equipment layout to reduce handling costs | $20,642 | $11,793 | - | - | $20,642 | |
TOTAL RECOMMENDED | $83,334 | $85,943 |
$10,213
383,939
kWh
|
$22,378
-
kW-mo/yr
|
$50,743 | ||
TOTAL IMPLEMENTED | $46,776 | $14,988 |
$379
14,361
kWh
|
$184
-
kW-mo/yr
|
$46,213 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs