ITAC Assessment: IA0220
ITAC logo
ITAC Assessment: IA0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product fertilizers, herbicides, insecticides
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 115
Plant Area 250,000
ft2
Annual Production 15,000
Tgal
Production Hrs. Annual 6,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,087 5,754,103
kWh
Electricity Demand $155,869 11,304
kW-mo/yr
Natural Gas $73,547 29,532
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,691 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,950 - $2,475
100,234
kWh
$2,475
-
kW-mo/yr
02 2.4221: Install compressor air intakes in coolest locations $3,697 $500 $1,222
49,531
kWh
$2,475
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,645 $50 $882
35,756
kWh
$1,763
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,597 $232 $797
32,239
kWh
$800
-
kW-mo/yr
05 2.4133: Use most efficient type of electric motors $2,802 - $1,157
46,893
kWh
$1,645
-
kW-mo/yr
TOTAL RECOMMENDED $15,691 $782 $6,533
264,653
kWh
$9,158
-
kW-mo/yr
TOTAL IMPLEMENTED $10,244 $732 $4,494
182,004
kWh
$5,750
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs