Assessment Year | 2020 |
---|---|
Principal Product | corrugated cardboard packaging materials |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 98 |
Plant Area |
435,000
ft2
|
Annual Production | 450,000,000
lb
|
Production Hrs. Annual | 6,072
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $463,717 | 6,197,150 |
kWh
|
$0.075 |
Electricity Demand | $58,446 | 20,276 |
kW-mo/yr
|
$2.88 |
TOTAL YEARLY COSTS | $522,163 | |||
RECOMMENDED SAVINGS* | $52,005 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,697 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7144: Install spectral reflectors / delamp | $2,928 | $750 |
$863
11,519
kWh
|
$65
-
kW-mo/yr
|
$2,000 | |
02 | 2.7135: Install occupancy sensors | $14,842 | $19,695 |
$14,842
197,899
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,682 | $340 |
$5,281
70,417
kWh
|
$401
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,835 | $640 |
$4,495
59,931
kWh
|
$340
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,092 | $320 |
$4,733
63,108
kWh
|
$359
-
kW-mo/yr
|
- | |
06 | 2.6242: Minimize operation of equipment maintained in standby condition | $18,626 | $1,400 |
$15,757
210,089
kWh
|
$2,869
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $52,005 | $23,145 |
$45,971
612,963
kWh
|
$4,034
-
kW-mo/yr
|
$2,000 | ||
TOTAL IMPLEMENTED | $27,697 | $21,405 |
$24,933
332,457
kWh
|
$764
-
kW-mo/yr
|
$2,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs