ITAC Assessment: IA0219
ITAC logo
ITAC Assessment: IA0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product vinyl siding and window profiles
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 80,000,000
lb
Production Hrs. Annual 8,016
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $420,942 18,619,871
kWh
Electricity Demand $167,921 31,788
kW-mo/yr
Natural Gas $31,620 6,490
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $401,761 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $9,876 $1,788 $9,876
436,987
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,956 $195 $2,207
97,597
kWh
$749
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,239 - $3,913
173,212
kWh
$1,326
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,916 $25 $1,431
63,306
kWh
$485
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,383 $5,695 $910
40,152
kWh
$473
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,373 $246 $1,023
45,428
kWh
$350
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $237 $1,197 $237
10,551
kWh
- - - -
08 3.4151: Minimize water usage $95,331 $50 - - - - $95,331
-
Tgal
09 4.441: Install automatic packing equipment $254,475 $511,800 - - $254,475 - -
10 4.131: Modify process to reduce material use/cost $28,975 $132 - - - $28,975 -
TOTAL RECOMMENDED $401,761 $521,128 $19,597
867,233
kWh
$3,383
-
kW-mo/yr
$254,475 $28,975 $95,331
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs