Assessment Year | 1998 |
---|---|
Principal Product | custom processed meat products |
NAICS |
n/a
|
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
40,000
ft2
|
Annual Production | 14,000,000
lb
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,031 | 3,645,956 |
kWh
|
$0.043 |
Electricity Demand | $1,079 | 99 |
kW-mo/yr
|
$10.90 |
Natural Gas | $68,831 | 19,820 |
MMBtu
|
$3.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,143 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,942 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,454 | $117 |
$1,053
26,377
kWh
|
$401
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,201 | $1,368 |
$627
15,826
kWh
|
$574
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $782 | $1,825 |
$355
8,792
kWh
|
$427
-
kW-mo/yr
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $370 | $732 |
$370
9,379
kWh
|
- | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $223 | $25 |
$103
2,638
kWh
|
$120
-
kW-mo/yr
|
- | - | - | |
06 | 3.1192: Reduce scrap production | $13,440 | $6,387 | - | - | - | - |
$13,440
-
lb
|
|
07 | 3.4115: Recover and reuse cooling water | $8,942 | $1,355 |
$(-84.0)
(-2,052)
kWh
|
$(-67.0)
-
kW-mo/yr
|
- |
$9,093
-
Tgal
|
- | |
08 | 3.4151: Minimize water usage | $4,731 | $5,000 |
$(-641.0)
(-16,120)
kWh
|
$(-748.0)
-
kW-mo/yr
|
$897
-
MMBtu
|
$5,223
-
Tgal
|
- | |
TOTAL RECOMMENDED | $31,143 | $16,809 |
$1,783
44,840
kWh
|
$707
-
kW-mo/yr
|
$897
-
MMBtu
|
$14,316
-
Tgal
|
$13,440
-
lb
|
||
TOTAL IMPLEMENTED | $8,942 | $1,355 |
$(-84.0)
(-2,052)
kWh
|
$(-67.0)
-
kW-mo/yr
|
- |
$9,093
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs