ITAC Assessment: IA0190
ITAC logo
ITAC Assessment: IA0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product doors & work surfaces
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 220,000
ft2
Annual Production 1,600,000
pieces
Production Hrs. Annual 6,732
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,428 8,332,063
kWh
Electricity Demand $68,642 20,460
kW-mo/yr
Natural Gas $28,464 6,420
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,727 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,717

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Primary Raw Material Savings
01 2.4311: Recover mechanical energy $3,725 $4,986 $2,325
105,803
kWh
$1,400
-
kW-mo/yr
- -
02 3.8132: Use less toxic and volatile solvent substitutes $2,195 $500 - - $6,660
-
lb
$(-4,465.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,275 $4,000 $2,044
92,907
kWh
$1,231
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,178 $4,966 $2,608
118,699
kWh
$1,570
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $1,344 $400 $832
41,032
kWh
$512
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $1,010 $3,458 $1,010
46,014
kWh
- - -
TOTAL RECOMMENDED $15,727 $18,310 $8,819
404,455
kWh
$4,713
-
kW-mo/yr
$6,660
-
lb
$(-4,465.0)
TOTAL IMPLEMENTED $14,717 $14,852 $7,809
358,441
kWh
$4,713
-
kW-mo/yr
$6,660
-
lb
$(-4,465.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs