Assessment Year | 1998 |
---|---|
Principal Product | doors & work surfaces |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
220,000
ft2
|
Annual Production | 1,600,000
pieces
|
Production Hrs. Annual | 6,732
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $268,428 | 8,332,063 |
kWh
|
$0.032 |
Electricity Demand | $68,642 | 20,460 |
kW-mo/yr
|
$3.35 |
Natural Gas | $28,464 | 6,420 |
MMBtu
|
$4.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,727 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,717 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4311: Recover mechanical energy | $3,725 | $4,986 |
$2,325
105,803
kWh
|
$1,400
-
kW-mo/yr
|
- | - | |
02 | 3.8132: Use less toxic and volatile solvent substitutes | $2,195 | $500 | - | - |
$6,660
-
lb
|
$(-4,465.0) | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,275 | $4,000 |
$2,044
92,907
kWh
|
$1,231
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,178 | $4,966 |
$2,608
118,699
kWh
|
$1,570
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,344 | $400 |
$832
41,032
kWh
|
$512
-
kW-mo/yr
|
- | - | |
06 | 2.7135: Install occupancy sensors | $1,010 | $3,458 |
$1,010
46,014
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $15,727 | $18,310 |
$8,819
404,455
kWh
|
$4,713
-
kW-mo/yr
|
$6,660
-
lb
|
$(-4,465.0) | ||
TOTAL IMPLEMENTED | $14,717 | $14,852 |
$7,809
358,441
kWh
|
$4,713
-
kW-mo/yr
|
$6,660
-
lb
|
$(-4,465.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs