ITAC Assessment: IA0189
ITAC logo
ITAC Assessment: IA0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product pennants and buttons
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 51,800
ft2
Annual Production 40,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,252 1,750,000
kWh
Electricity Demand $34,422 4,500
kW-mo/yr
Natural Gas $18,677 3,964
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.112: Replace old machine with new automatic multi-station tool $4,134 $4,000 - - $4,134 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,819 $16,391 $7,605
245,311
kWh
$1,214
-
kW-mo/yr
- -
03 3.5311: Recover and reuse waste material $2,357 $500 - - - $2,357
04 2.4221: Install compressor air intakes in coolest locations $423 $200 $297
9,672
kWh
$126
-
kW-mo/yr
- -
05 2.4314: Use synthetic lubricant $349 $173 $200
6,448
kWh
$90
-
kW-mo/yr
$59 -
TOTAL RECOMMENDED $16,082 $21,264 $8,102
261,431
kWh
$1,430
-
kW-mo/yr
$4,193 $2,357
TOTAL IMPLEMENTED $11,525 $17,064 $7,805
251,759
kWh
$1,304
-
kW-mo/yr
$59 $2,357
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs