ITAC Assessment: IA0174
ITAC logo
ITAC Assessment: IA0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product lithographic printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 115,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,949 2,406,800
kWh
Electricity Demand $211,507 19,584
kW-mo/yr
Natural Gas $29,550 7,856
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
01 3.2176: Increase use of automation $27,121 $32,200 $(-85.0)
(-3,517)
kWh
$(-194.0)
-
kW-mo/yr
- - $27,400 - -
02 2.7229: Air condition only space necessary $8,478 $11,500 $2,646
108,148
kWh
$5,832
-
kW-mo/yr
- - - - -
03 2.4133: Use most efficient type of electric motors $1,431 $920 $873
35,756
kWh
$558
-
kW-mo/yr
- - - - -
04 3.5313: Increase amount of waste recovered for resale $5,570 $700 - - - $2,760
-
lb
- - $2,810
05 2.2443: Re-use or recycle hot or cold process exhaust air $4,841 $8,840 - - $4,841
-
MMBtu
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,123 $2,592 $1,931
78,839
kWh
$1,192
-
kW-mo/yr
- - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,477 $25 $920
37,515
kWh
$557
-
kW-mo/yr
- - - - -
08 2.4221: Install compressor air intakes in coolest locations $899 $330 $562
22,860
kWh
$337
-
kW-mo/yr
- - - - -
09 3.1191: Change procedures / equipment / operating conditions $111 $30 - - - $111
-
lb
- - -
10 2.8121: Apply for tax-free status for energy purchases $1,236 $250 - - - - - $1,236 -
TOTAL RECOMMENDED $54,287 $57,387 $6,847
279,601
kWh
$8,282
-
kW-mo/yr
$4,841
-
MMBtu
$2,871
-
lb
$27,400 $1,236 $2,810
TOTAL IMPLEMENTED $10,170 $3,317 $2,851
116,354
kWh
$1,749
-
kW-mo/yr
- $2,760
-
lb
- - $2,810
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs