ITAC Assessment: IA0172
ITAC logo
ITAC Assessment: IA0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product metal doors
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 134,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,419 1,522,861
kWh
Electricity Demand $23,873 3,252
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $224,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $101,637

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings By-product Production Savings
01 4.441: Install automatic packing equipment $120,000 $150,000 - - $120,000 - - -
02 3.1191: Change procedures / equipment / operating conditions $90,720 $10,000 - - - - $145,800 $(-55,080.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,126 $17,669 $5,126
201,055
kWh
- - - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $2,906 $7,400 - - $(-2,250.0) $5,156 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,649 $743 $1,700
65,358
kWh
$949
-
kW-mo/yr
- - - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,326 $10,347 $(-78.0)
(-2,931)
kWh
$(-131.0)
-
kW-mo/yr
- $2,535 - -
07 2.4221: Install compressor air intakes in coolest locations $654 $162 $451
17,292
kWh
$203
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $162 $200 $101
3,810
kWh
$61
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $224,543 $196,521 $7,300
284,584
kWh
$1,082
-
kW-mo/yr
$117,750 $7,691 $145,800 $(-55,080.0)
TOTAL IMPLEMENTED $101,637 $39,121 $7,300
284,584
kWh
$1,082
-
kW-mo/yr
- $2,535 $145,800 $(-55,080.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs