ITAC Assessment: IA0171
ITAC logo
ITAC Assessment: IA0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product beef products
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $100
M
to 500
M
# of Employees 401
Plant Area 125,000
ft2
Annual Production 539,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $465,715 19,248,242
kWh
Electricity Demand $357,322 42,096
kW-mo/yr
Natural Gas $696,716 265,718
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 3.4111: Use closed cycle process to minimize waste water production $13,500 $25,100 - - - $13,500
-
Tgal
02 2.4221: Install compressor air intakes in coolest locations $5,701 $4,500 $2,822
125,440
kWh
$2,879
-
kW-mo/yr
- -
03 2.1213: Direct warmest air to combustion intake $3,600 $1,720 - - $3,600
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,164 $1,652 $1,182
52,462
kWh
$982
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $374 $684 $130
5,862
kWh
$244
-
kW-mo/yr
- -
TOTAL RECOMMENDED $25,339 $33,656 $4,134
183,764
kWh
$4,105
-
kW-mo/yr
$3,600
-
MMBtu
$13,500
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs