*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product water and oil based paints
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 100,000
ft2
Annual Production 2,000
Tgal
Production Hrs. Annual 3,060
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,745 790,152
kWh
Electricity Demand $25,162 4,404
kW-mo/yr
Natural Gas $31,103 6,873
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,364 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings
01 2.4226: Use / purchase optimum sized compressor $1,813 $250 $1,103
31,653
kWh
$710
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $1,578 $200 $1,296
36,928
kWh
$282
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,264 $250 $767
21,981
kWh
$497
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,736 $7,752 $1,653
47,186
kWh
$1,083
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $887 $2,422 $501
14,361
kWh
$386
-
kW-mo/yr
-
06 3.5311: Recover and reuse waste material $86 - - - $86
-
lb
TOTAL RECOMMENDED $8,364 $10,874 $5,320
152,109
kWh
$2,958
-
kW-mo/yr
$86
-
lb
TOTAL IMPLEMENTED $4,000 $8,002 $2,420
69,167
kWh
$1,580
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs