ITAC Assessment: HO0168
ITAC logo
ITAC Assessment: HO0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Concrete Mixes
NAICS
n/a
SIC 3270:
Sales Range $5
M
to 10
M
# of Employees 41
Plant Area 35,000
ft2
Annual Production 150,000
ton
Production Hrs. Annual 3,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,832 927,022
kWh
Electricity Demand $34,602 3,681
kW-mo/yr
Electricity Fees $140 -
Natural Gas $70,061 23,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $824 $505 $824
9,379
kWh
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,230 $50 $2,340
26,964
kWh
$890
-
kW-mo/yr
- - -
03 2.2511: Insulate bare equipment $2,141 $755 - - $2,141
-
MMBtu
- -
04 2.2414: Use waste heat from hot flue gases to preheat $2,473 $6,290 - - $2,473
-
MMBtu
- -
05 4.611: Begin a practice of predictive / preventative maintenance $15,746 $22,000 - - $2,471
-
MMBtu
$13,275 -
06 4.652: Replace existing equipment with more suitable substitutes $46,021 $100,000 - - $21,021
-
MMBtu
$20,000 $5,000
TOTAL RECOMMENDED $70,435 $129,600 $3,164
36,343
kWh
$890
-
kW-mo/yr
$28,106
-
MMBtu
$33,275 $5,000
TOTAL IMPLEMENTED $50,075 $100,555 $3,164
36,343
kWh
$890
-
kW-mo/yr
$21,021
-
MMBtu
$20,000 $5,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs