Assessment Year | 1998 |
---|---|
Principal Product | Concrete Mixes |
NAICS |
n/a
|
SIC | 3270: |
Sales Range | $5 M to 10M |
# of Employees | 41 |
Plant Area |
35,000
ft2
|
Annual Production | 150,000
ton
|
Production Hrs. Annual | 3,400
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $80,832 | 927,022 |
kWh
|
$0.087 |
Electricity Demand | $34,602 | 3,681 |
kW-mo/yr
|
$9.40 |
Electricity Fees | $140 | - |
|
- |
Natural Gas | $70,061 | 23,280 |
MMBtu
|
$3.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,435 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,075 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $824 | $505 |
$824
9,379
kWh
|
- | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,230 | $50 |
$2,340
26,964
kWh
|
$890
-
kW-mo/yr
|
- | - | - | |
03 | 2.2511: Insulate bare equipment | $2,141 | $755 | - | - |
$2,141
-
MMBtu
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $2,473 | $6,290 | - | - |
$2,473
-
MMBtu
|
- | - | |
05 | 4.611: Begin a practice of predictive / preventative maintenance | $15,746 | $22,000 | - | - |
$2,471
-
MMBtu
|
$13,275 | - | |
06 | 4.652: Replace existing equipment with more suitable substitutes | $46,021 | $100,000 | - | - |
$21,021
-
MMBtu
|
$20,000 | $5,000 | |
TOTAL RECOMMENDED | $70,435 | $129,600 |
$3,164
36,343
kWh
|
$890
-
kW-mo/yr
|
$28,106
-
MMBtu
|
$33,275 | $5,000 | ||
TOTAL IMPLEMENTED | $50,075 | $100,555 |
$3,164
36,343
kWh
|
$890
-
kW-mo/yr
|
$21,021
-
MMBtu
|
$20,000 | $5,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs