Assessment Year | 2011 |
---|---|
Principal Product | automobiles |
NAICS | 336112: Light Truck and Utility Vehicle Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | greater than $500 M |
# of Employees | 4,000 |
Plant Area |
3,500,000
ft2
|
Annual Production | 225,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $13,920,000 | 200,000,000 |
kWh
|
$0.070 |
Natural Gas | $900,000 | 100,000 |
MMBtu
|
$9.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,149,286 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $223,288 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $223,288 | $22,500 |
$223,288
3,208,162
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $224,396 | $387,720 |
$224,396
3,224,084
kWh
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $27,256 | $85,000 |
$48,776
700,800
kWh
|
$(-21,520.0)
-
MMBtu
|
|
04 | 2.2441: Preheat boiler makeup water with waste process heat | $98,700 | $112,800 | - |
$98,700
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $164,422 | $19,809 |
$164,422
2,362,389
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $411,224 | $71,550 |
$411,224
5,908,389
kWh
|
- | |
TOTAL RECOMMENDED | $1,149,286 | $699,379 |
$1,072,106
15,403,824
kWh
|
$77,180
-
MMBtu
|
||
TOTAL IMPLEMENTED | $223,288 | $22,500 |
$223,288
3,208,162
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs