ITAC Assessment: IA0147
ITAC logo
ITAC Assessment: IA0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Custom Plastic Moldings
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 95
Plant Area 35,000
ft2
Annual Production 1,250,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,601 2,078,839
kWh
Electricity Demand $4,975 5,616
kW-mo/yr
Electricity Fees $2,274 -
Natural Gas $6,847 1,907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,652 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,007 $50 $2,902
60,668
kWh
$105
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $660 $217 $638
13,189
kWh
$22
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $540 $169 $521
10,844
kWh
$19
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $296 $268 $286
5,862
kWh
$10
-
kW-mo/yr
-
05 3.5212: Regrind, reuse, or sell scrap plastic parts $149 $100 - - $149
-
lb
TOTAL RECOMMENDED $4,652 $804 $4,347
90,563
kWh
$156
-
kW-mo/yr
$149
-
lb
TOTAL IMPLEMENTED $4,207 $436 $4,061
84,701
kWh
$146
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs