Assessment Year | 1996 |
---|---|
Principal Product | horse/livestock trailers |
NAICS |
n/a
|
SIC | 3799: Transportation Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
120,000
ft2
|
Annual Production | 2,380
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,775 | 745,897 |
kWh
|
$0.080 |
Electricity Fees | $888 | - |
|
- |
Natural Gas | $22,632 | 7,195 |
MMBtu
|
$3.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,244 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,603 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,261 | $18,994 |
$4,261
53,341
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $643 | $1,421 |
$643
7,913
kWh
|
- | |
03 | 2.7134: Use photocell controls | $462 | $145 |
$462
6,155
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24 | $48 |
$24
293
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,152 | $4,152 |
$4,152
51,876
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,174 | $25 |
$1,174
14,654
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $575 | $155 |
$575
7,327
kWh
|
- | |
08 | 2.6218: Turn off equipment when not in use | $129 | - |
$129
1,465
kWh
|
- | |
09 | 3.1191: Change procedures / equipment / operating conditions | $824 | $3,224 | - |
$824
-
gal
|
|
TOTAL RECOMMENDED | $12,244 | $28,164 |
$11,420
143,024
kWh
|
$824
-
gal
|
||
TOTAL IMPLEMENTED | $9,603 | $23,494 |
$9,603
120,457
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs