ITAC Assessment: NC0291
ITAC logo
ITAC Assessment: NC0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product cases of bottled soda
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 120,000
ft2
Annual Production 22,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,501 6,732,000
kWh
Electricity Demand $156,458 15,913
kW-mo/yr
Electricity Fees $10,626 -
LPG $116,699 13,361
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,124 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $68,169 $77,000 $(-11,462.0)
(-396,600)
kWh
$(-7,472.0)
-
kW-mo/yr
$87,103
-
MMBtu
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,122 $9,500 $6,344
219,500
kWh
$4,962
-
kW-mo/yr
$(-8,184.0)
-
MMBtu
- - -
03 3.5317: Sell / offer by-product as animal feed $29,780 $8,900 - - - $29,780
-
Tgal
- -
04 2.4239: Eliminate or reduce compressed air usage $412 $250 $240
8,320
kWh
$172
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $208 $100 $610
21,120
kWh
$398
-
kW-mo/yr
- - $(-400.0) $(-400.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $433 $214 $262
9,051
kWh
$171
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $102,124 $95,964 $(-4,006.0)
(-138,609)
kWh
$(-1,769.0)
-
kW-mo/yr
$78,919
-
MMBtu
$29,780
-
Tgal
$(-400.0) $(-400.0)
TOTAL IMPLEMENTED $4,175 $10,064 $7,456
257,991
kWh
$5,703
-
kW-mo/yr
$(-8,184.0)
-
MMBtu
- $(-400.0) $(-400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs