Assessment Year | 1996 |
---|---|
Principal Product | Aluminum Castings |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $1 M to 5M |
# of Employees | 45 |
Plant Area |
22,500
ft2
|
Annual Production | 1,913,487
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $20,586 | 820,340 |
kWh
|
$0.025 |
Electricity Demand | $15,282 | 2,736 |
kW-mo/yr
|
$5.59 |
Electricity Fees | $10,200 | - |
|
- |
Natural Gas | $62,575 | 20,553 |
MMBtu
|
$3.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,809 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,962 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,183 | $640 |
$820
30,481
kWh
|
$363
-
kW-mo/yr
|
- | - | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $1,401 | $1,128 | - | - |
$1,401
-
MMBtu
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,672 | $463 |
$1,182
43,669
kWh
|
$490
-
kW-mo/yr
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $282 | $25 |
$197
7,327
kWh
|
$85
-
kW-mo/yr
|
- | - | - | |
05 | 3.4111: Use closed cycle process to minimize waste water production | $27,825 | $54,500 |
$2,894
108,148
kWh
|
$(-1,281.0)
-
kW-mo/yr
|
- |
$26,212
-
Tgal
|
- | |
06 | 3.3128: Utilize other methods to remove contaminants | $5,446 | $16,125 | - | - | - | - |
$5,446
-
lb
|
|
TOTAL RECOMMENDED | $37,809 | $72,881 |
$5,093
189,625
kWh
|
$(-343.0)
-
kW-mo/yr
|
$1,401
-
MMBtu
|
$26,212
-
Tgal
|
$5,446
-
lb
|
||
TOTAL IMPLEMENTED | $30,962 | $55,628 |
$5,093
189,625
kWh
|
$(-343.0)
-
kW-mo/yr
|
- |
$26,212
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs