Assessment Year | 1996 |
---|---|
Principal Product | Ring Gears |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
200,000
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 6,720
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $89,526 | 4,388,335 |
kWh
|
$0.020 |
Electricity Demand | $72,509 | 10,416 |
kW-mo/yr
|
$6.96 |
Electricity Fees | $7,135 | - |
|
- |
Natural Gas | $91,496 | 34,685 |
MMBtu
|
$2.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,211 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,453 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $9,887 | $1,427 | - | - |
$9,887
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,108 | $5,087 |
$1,564
76,495
kWh
|
$544
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $145 | $1,366 |
$100
4,982
kWh
|
$45
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $102 | $296 |
$70
3,517
kWh
|
$32
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,104 | $239 |
$1,449
70,926
kWh
|
$655
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $862 | $25 |
$596
29,308
kWh
|
$266
-
kW-mo/yr
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $365 | $150 |
$251
12,309
kWh
|
$114
-
kW-mo/yr
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $341 | $190 |
$236
11,723
kWh
|
$105
-
kW-mo/yr
|
- | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,350 | $5,000 | - | - |
$1,350
-
MMBtu
|
- | |
10 | 3.6124: Burn waste oil for heat | $4,051 | $12,500 | - | - |
$4,051
-
MMBtu
|
- | |
11 | 3.7198: Reduce / eliminate use of disposable product | $1,896 | $2,755 | - | - | - |
$1,896
-
lb
|
|
TOTAL RECOMMENDED | $23,211 | $29,035 |
$4,266
209,260
kWh
|
$1,761
-
kW-mo/yr
|
$15,288
-
MMBtu
|
$1,896
-
lb
|
||
TOTAL IMPLEMENTED | $13,453 | $4,843 |
$1,153
56,857
kWh
|
$517
-
kW-mo/yr
|
$9,887
-
MMBtu
|
$1,896
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |