ITAC Assessment: BS0079
ITAC logo
ITAC Assessment: BS0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Pickled Asparagus and Beans
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 24,500
ft2
Annual Production 1,460,000
pieces
Production Hrs. Annual 1,500
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,757 125,304
kWh
Electricity Demand $5,229 772
kW-mo/yr
LPG $37,001 1,896
MMBtu
TOTAL YEARLY COSTS $48,987
RECOMMENDED SAVINGS* $1,931 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $154

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.2442: Preheat combustion air with waste heat $1,545 $6,216 - $1,545
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $154 $148 $154
2,859
kWh
-
03 2.2623: Minimize condenser cooling water temperature $232 $850 $232
4,298
kWh
-
TOTAL RECOMMENDED $1,931 $7,214 $386
7,157
kWh
$1,545
-
MMBtu
TOTAL IMPLEMENTED $154 $148 $154
2,859
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs