Assessment Year | 1996 |
---|---|
Principal Product | steel lifting apparatus |
NAICS |
n/a
|
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 205 |
Plant Area |
97,000
ft2
|
Annual Production | 12,000,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $243,678 | 10,166,471 |
kWh
|
$0.024 |
Electricity Demand | $199,713 | 34,392 |
kW-mo/yr
|
$5.81 |
Electricity Fees | $4,654 | - |
|
- |
Natural Gas | $177,913 | 59,160 |
MMBtu
|
$3.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,121 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,121 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,854 | $55,160 |
$1,243
52,462
kWh
|
$611
-
kW-mo/yr
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,732 | $1,914 |
$1,161
48,359
kWh
|
$571
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $9,178 | $1,432 |
$6,100
254,103
kWh
|
$3,078
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,553 | $3,556 |
$2,383
99,355
kWh
|
$1,170
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,030 | $1,492 |
$690
28,722
kWh
|
$340
-
kW-mo/yr
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $1,033 | $997 |
$592
24,619
kWh
|
$441
-
kW-mo/yr
|
- | - | - | |
07 | 3.4111: Use closed cycle process to minimize waste water production | $9,744 | $14,835 |
$1,101
46,014
kWh
|
$542
-
kW-mo/yr
|
$8,101
-
Tgal
|
- | - | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,085 | $7,400 | - | - | - | - |
$2,085
-
lb
|
|
09 | 3.6112: Use filter and drying oven to reduce sludge volume | $1,197 | $1,200 | - | - | - |
$1,197
-
gal
|
- | |
10 | 3.7198: Reduce / eliminate use of disposable product | $715 | $1,500 | - | - | - | - |
$715
-
lb
|
|
TOTAL RECOMMENDED | $32,121 | $89,486 |
$13,270
553,634
kWh
|
$6,753
-
kW-mo/yr
|
$8,101
-
Tgal
|
$1,197
-
gal
|
$2,800
-
lb
|
||
TOTAL IMPLEMENTED | $32,121 | $89,486 |
$13,270
553,634
kWh
|
$6,753
-
kW-mo/yr
|
$8,101
-
Tgal
|
$1,197
-
gal
|
$2,800
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs