| Assessment Year | 1993 |
|---|---|
| Principal Product | VEHICLE ASSEMBLIES |
| NAICS |
n/a
|
| SIC | 3713: Truck and Bus Bodies |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 4,500
pieces
|
| Production Hrs. Annual | 2,730
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $52,548 | 511,723 |
kWh
|
$0.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,802 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,693 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7234: Use heat pump for space conditioning | $3,160 | $10,114 |
$3,160
30,774
kWh
|
- | |
| 02 | 2.7212: Install or upgrade insulation on hvac distribution systems | $1,276 | $227 |
$1,276
12,309
kWh
|
- | |
| 03 | 2.7261: Install timers and/or thermostats | $2,941 | $975 |
$2,941
28,722
kWh
|
- | |
| 04 | 2.4314: Use synthetic lubricant | $177 | $636 |
$60
586
kWh
|
$117 | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $975 | $200 |
$975
9,379
kWh
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $46 | $137 |
$46
586
kWh
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $118 | - |
$118
1,172
kWh
|
- | |
| 08 | 2.7144: Install spectral reflectors / delamp | $3,519 | $7,796 |
$3,519
34,291
kWh
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,333 | $8,480 |
$2,333
22,860
kWh
|
- | |
| 10 | 2.7135: Install occupancy sensors | $257 | $350 |
$257
2,638
kWh
|
- | |
| TOTAL RECOMMENDED | $14,802 | $28,915 |
$14,685
143,317
kWh
|
$117 | ||
| TOTAL IMPLEMENTED | $8,693 | $12,289 |
$8,576
83,528
kWh
|
$117 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs