ITAC Assessment: IA0132
ITAC logo
ITAC Assessment: IA0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Hydraulic cylinders
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area 79,000,000
ft2
Annual Production 4,500
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,214 1,092,614
kWh
Natural Gas $21,504 5,778
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,777

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,991 $245 $10,991
181,419
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,009 $50 $3,009
49,531
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,448 $93 $1,448
24,033
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,481 $4,837 $1,481
24,326
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $380 $136 $380
6,155
kWh
-
06 2.7135: Install occupancy sensors $124 $231 $124
2,052
kWh
-
07 2.8123: Pay utility bills on time $936 - $936
-
kWh
-
08 2.4322: Use or replace with energy efficient substitutes $2,841 $12,000 $2,841
46,600
kWh
-
09 3.5248: Separate and recycle scrap metal to foundry or for sale $35,460 $500 - $35,460
-
lb
10 3.1163: Use plastic pallets instead of wood $5,805 $16,900 - $5,805
-
lb
11 3.7115: Clean lines with "pigs" instead of solvents / solutions $2,738 $1,300 - $2,738
-
lb
TOTAL RECOMMENDED $65,213 $36,292 $21,210
334,116
kWh
$44,003
-
lb
TOTAL IMPLEMENTED $17,777 $12,295 $17,777
277,550
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs