ITAC Assessment: DS0173
ITAC logo
ITAC Assessment: DS0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Pillows
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $5
M
to 10
M
# of Employees 89
Plant Area 58,200
ft2
Annual Production 750,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,419 662,661
kWh
Electricity Demand $18,894 2,664
kW-mo/yr
Electricity Fees $3,434 -
Natural Gas $4,510 792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,046 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,231

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,510 $3,702 $709
20,809
kWh
$801
-
kW-mo/yr
- - - -
02 2.3212: Optimize plant power factor $588 $700 - - $588 - - -
03 2.7261: Install timers and/or thermostats $1,399 $1,595 - - - $1,399
-
MMBtu
- -
04 2.7122: Disconnect ballasts $734 $160 $342
9,965
kWh
$392
-
kW-mo/yr
- - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $5,574 $8,370 - - - - $5,574
-
lb
-
06 3.6125: Sell combustible waste $2,721 $8,050 - - - - $2,721
-
lb
-
07 4.652: Replace existing equipment with more suitable substitutes $5,520 - - - - - - $5,520
TOTAL RECOMMENDED $18,046 $22,577 $1,051
30,774
kWh
$1,193
-
kW-mo/yr
$588 $1,399
-
MMBtu
$8,295
-
lb
$5,520
TOTAL IMPLEMENTED $4,231 $6,157 $1,051
30,774
kWh
$1,193
-
kW-mo/yr
$588 $1,399
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs