ITAC Assessment: IA0131
ITAC logo
ITAC Assessment: IA0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product paper bags
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 160,000
ft2
Annual Production 140,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,047 5,495,018
kWh
Natural Gas $89,543 22,539
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,995 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,019

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $33,809 $11,700 - - $33,809
02 2.7111: Reduce illumination to minimum necessary levels $21,688 $64,875 $21,688
529,601
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,393 $9,302 $3,393
82,943
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $2,757 $390 $2,757
67,409
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,181 $25 $2,181
53,341
kWh
- -
06 2.1213: Direct warmest air to combustion intake $167 $360 - $167
-
MMBtu
-
TOTAL RECOMMENDED $63,995 $86,652 $30,019
733,294
kWh
$167
-
MMBtu
$33,809
TOTAL IMPLEMENTED $30,019 $74,592 $30,019
733,294
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs