Assessment Year | 1995 |
---|---|
Principal Product | hubs, spindles, rims, wheels |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 165 |
Plant Area |
112,653
ft2
|
Annual Production | 1,770,000
pieces
|
Production Hrs. Annual | 4,188
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $241,914 | 4,339,684 |
kWh
|
$0.056 |
Natural Gas | $59,269 | 20,637 |
MMBtu
|
$2.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,975 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,489 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,440 | $1,537 |
$4,440
79,719
kWh
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,564 | $135 |
$1,564
28,136
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $758 | $25 |
$758
13,482
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $815 | $250 |
$815
14,654
kWh
|
- | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $510 | $25 |
$510
9,086
kWh
|
- | - | |
06 | 2.2515: Use optimum thickness insulation | $303 | $1,020 | - |
$303
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $948 | $169 |
$948
16,999
kWh
|
- | - | |
08 | 2.7135: Install occupancy sensors | $784 | $920 |
$784
14,068
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $909 | $1,570 |
$909
16,413
kWh
|
- | - | |
10 | 3.3128: Utilize other methods to remove contaminants | $15,944 | $2,290 | - | - |
$15,944
-
lb
|
|
TOTAL RECOMMENDED | $26,975 | $7,941 |
$10,728
192,557
kWh
|
$303
-
MMBtu
|
$15,944
-
lb
|
||
TOTAL IMPLEMENTED | $9,489 | $4,706 |
$9,186
165,007
kWh
|
$303
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs