Assessment Year | 2009 |
---|---|
Principal Product | Paint Manufacturing |
NAICS | 325510: Paint and Coating Manufacturing |
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $100 M to 500M |
# of Employees | 156 |
Plant Area |
139,000
ft2
|
Annual Production | 29,300
Tgal
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,270,416 | 13,120,460 |
kWh
|
$0.097 |
Natural Gas | $1,324,140 | 1,251,470 |
MMBtu
|
$1.06 |
Other Energy | $82,587 | 2,247 |
MMBtu
|
$36.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $217,268 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,425 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $70,852 | $10,000 | - |
$70,852
-
MMBtu
|
|
02 | 2.2135: Repair and eliminate steam leaks | $76,620 | $120,000 | - |
$76,620
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $34,425 | $12,000 |
$34,425
405,000
kWh
|
- | |
04 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $28,800 | $44,500 | - |
$28,800
-
MMBtu
|
|
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $4,041 | - |
$4,041
37,776
kWh
|
- | |
06 | 2.2163: Use minimum steam operating pressure | $2,530 | - | - |
$2,530
-
MMBtu
|
|
TOTAL RECOMMENDED | $217,268 | $186,500 |
$38,466
442,776
kWh
|
$178,802
-
MMBtu
|
||
TOTAL IMPLEMENTED | $34,425 | $12,000 |
$34,425
405,000
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs