ITAC Assessment: IA0111
ITAC logo
ITAC Assessment: IA0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product automotive reconditioning equipment
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 108,862
ft2
Annual Production 5,400
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,880 2,080,891
kWh
Natural Gas $3,814 888
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,478

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,199 $58,658 $20,199
316,237
kWh
- -
02 2.4133: Use most efficient type of electric motors $3,310 $3,860 $3,310
51,876
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,777 $9,655 $2,777
43,376
kWh
- -
04 2.7135: Install occupancy sensors $1,159 $1,609 $1,159
18,171
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $1,029 $500 $1,029
16,120
kWh
- -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $11,610 $1,200 - $11,610
-
lb
-
07 3.1191: Change procedures / equipment / operating conditions $2,022 $1,716 - $2,022
-
lb
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,672 $8,000 - - $1,672
TOTAL RECOMMENDED $43,778 $85,198 $28,474
445,780
kWh
$13,632
-
lb
$1,672
TOTAL IMPLEMENTED $5,478 $18,155 $3,806
59,496
kWh
- $1,672
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs