Assessment Year | 1995 |
---|---|
Principal Product | automotive reconditioning equipment |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
108,862
ft2
|
Annual Production | 5,400
pieces
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $132,880 | 2,080,891 |
kWh
|
$0.064 |
Natural Gas | $3,814 | 888 |
MMBtu
|
$4.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,778 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,478 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,199 | $58,658 |
$20,199
316,237
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $3,310 | $3,860 |
$3,310
51,876
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,777 | $9,655 |
$2,777
43,376
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $1,159 | $1,609 |
$1,159
18,171
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,029 | $500 |
$1,029
16,120
kWh
|
- | - | |
06 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $11,610 | $1,200 | - |
$11,610
-
lb
|
- | |
07 | 3.1191: Change procedures / equipment / operating conditions | $2,022 | $1,716 | - |
$2,022
-
lb
|
- | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,672 | $8,000 | - | - | $1,672 | |
TOTAL RECOMMENDED | $43,778 | $85,198 |
$28,474
445,780
kWh
|
$13,632
-
lb
|
$1,672 | ||
TOTAL IMPLEMENTED | $5,478 | $18,155 |
$3,806
59,496
kWh
|
- | $1,672 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs