ITAC Assessment: NC0529
ITAC logo
ITAC Assessment: NC0529
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Sport fishing boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 175,000
ft2
Annual Production 2
pieces
Production Hrs. Annual 2,875
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,966 1,154,260
kWh
Electricity Demand $29,268 2,995
kW-mo/yr
Electricity Fees $16,592 -
LPG $13,151 782
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,785

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $60,000 $40,000 - - - - $60,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,143 $1,156 $1,428
20,656
kWh
$438
-
kW-mo/yr
- $277 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,205 $16,872 $2,872
47,586
kWh
$1,373
-
kW-mo/yr
- $(-40.0) -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,169 $272 $660
7,267
kWh
- - $509 -
05 2.7135: Install occupancy sensors $766 $400 $766
8,438
kWh
- - - -
06 2.7224: Reduce space conditioning during non-working hours $1,318 $1,500 $1,318
27,681
kWh
- - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $764 $1,600 $555
8,534
kWh
$209
-
kW-mo/yr
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $399 $200 $727
9,209
kWh
$132
-
kW-mo/yr
$(-300.0) $(-160.0) -
09 2.7111: Reduce illumination to minimum necessary levels $38 $63 $17
360
kWh
$19
-
kW-mo/yr
- $2 -
TOTAL RECOMMENDED $70,802 $62,063 $8,343
129,731
kWh
$2,171
-
kW-mo/yr
$(-300.0) $588 $60,000
TOTAL IMPLEMENTED $6,785 $18,291 $5,044
77,811
kWh
$1,962
-
kW-mo/yr
$(-300.0) $79 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs