Assessment Year | 2014 |
---|---|
Principal Product | Sport fishing boats |
NAICS | 336612: Boat Building |
SIC | 3732: Boat Building and Repairing |
Sales Range | $10 M to 50M |
# of Employees | 113 |
Plant Area |
175,000
ft2
|
Annual Production | 2
pieces
|
Production Hrs. Annual | 2,875
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,966 | 1,154,260 |
kWh
|
$0.062 |
Electricity Demand | $29,268 | 2,995 |
kW-mo/yr
|
$9.77 |
Electricity Fees | $16,592 | - |
|
- |
LPG | $13,151 | 782 |
MMBtu
|
$16.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,802 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,785 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $60,000 | $40,000 | - | - | - | - | $60,000 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,143 | $1,156 |
$1,428
20,656
kWh
|
$438
-
kW-mo/yr
|
- | $277 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,205 | $16,872 |
$2,872
47,586
kWh
|
$1,373
-
kW-mo/yr
|
- | $(-40.0) | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,169 | $272 |
$660
7,267
kWh
|
- | - | $509 | - | |
05 | 2.7135: Install occupancy sensors | $766 | $400 |
$766
8,438
kWh
|
- | - | - | - | |
06 | 2.7224: Reduce space conditioning during non-working hours | $1,318 | $1,500 |
$1,318
27,681
kWh
|
- | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $764 | $1,600 |
$555
8,534
kWh
|
$209
-
kW-mo/yr
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $399 | $200 |
$727
9,209
kWh
|
$132
-
kW-mo/yr
|
$(-300.0) | $(-160.0) | - | |
09 | 2.7111: Reduce illumination to minimum necessary levels | $38 | $63 |
$17
360
kWh
|
$19
-
kW-mo/yr
|
- | $2 | - | |
TOTAL RECOMMENDED | $70,802 | $62,063 |
$8,343
129,731
kWh
|
$2,171
-
kW-mo/yr
|
$(-300.0) | $588 | $60,000 | ||
TOTAL IMPLEMENTED | $6,785 | $18,291 |
$5,044
77,811
kWh
|
$1,962
-
kW-mo/yr
|
$(-300.0) | $79 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs