Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aluminum windows, doors, hurricane shutters
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $5
M
to 10
M
# of Employees 19
Plant Area 67,500
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,918 129,882
kWh
Electricity Demand $4,628 570
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,532

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Product Savings
01 4.112: Replace old machine with new automatic multi-station tool $26,325 $45,000 - $26,325
02 4.512: Condense operation into one building $23,625 $714 - $23,625
03 4.323: Optimize lot sizes to reduce inventory carrying costs $16,250 $60 - $16,250
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,497 $60 $5,497
91,620
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $160 $2 $160
2,669
kWh
-
TOTAL RECOMMENDED $71,857 $45,836 $5,657
94,289
kWh
$66,200
TOTAL IMPLEMENTED $45,532 $836 $5,657
94,289
kWh
$39,875
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs