Assessment Year | 1995 |
---|---|
Principal Product | door hardware |
NAICS |
n/a
|
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 205 |
Plant Area |
71,000
ft2
|
Annual Production | 4,550,243
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $155,643 | 3,649,179 |
kWh
|
$0.043 |
Natural Gas | $60,415 | 14,449 |
MMBtu
|
$4.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,977 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,307 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $2,025 | $240 |
$2,025
47,479
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,336 | $860 |
$1,336
31,360
kWh
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $442 | $770 |
$442
10,258
kWh
|
- | - | - | |
04 | 2.2511: Insulate bare equipment | $622 | $142 | - |
$622
-
MMBtu
|
- | - | |
05 | 2.2511: Insulate bare equipment | $427 | $1,142 | - |
$427
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $513 | $200 |
$513
12,016
kWh
|
- | - | - | |
07 | 3.8225: Replace hexavalent chromium solutions with trivalent solutions | $3,023 | - | - | - | - |
$3,023
-
lb
|
|
08 | 3.7112: Use squeegees, mops, and vacuums for floor cleaning | $589 | $400 | - | - |
$589
-
lb
|
- | |
TOTAL RECOMMENDED | $8,977 | $3,754 |
$4,316
101,113
kWh
|
$1,049
-
MMBtu
|
$589
-
lb
|
$3,023
-
lb
|
||
TOTAL IMPLEMENTED | $3,307 | $3,372 |
$2,291
53,634
kWh
|
$427
-
MMBtu
|
$589
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs