ITAC Assessment: IA0108
ITAC logo
ITAC Assessment: IA0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product door hardware
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 205
Plant Area 71,000
ft2
Annual Production 4,550,243
lb
Production Hrs. Annual 6,120
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,643 3,649,179
kWh
Natural Gas $60,415 14,449
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,977 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,307

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.7111: Reduce illumination to minimum necessary levels $2,025 $240 $2,025
47,479
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,336 $860 $1,336
31,360
kWh
- - -
03 2.7135: Install occupancy sensors $442 $770 $442
10,258
kWh
- - -
04 2.2511: Insulate bare equipment $622 $142 - $622
-
MMBtu
- -
05 2.2511: Insulate bare equipment $427 $1,142 - $427
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $513 $200 $513
12,016
kWh
- - -
07 3.8225: Replace hexavalent chromium solutions with trivalent solutions $3,023 - - - - $3,023
-
lb
08 3.7112: Use squeegees, mops, and vacuums for floor cleaning $589 $400 - - $589
-
lb
-
TOTAL RECOMMENDED $8,977 $3,754 $4,316
101,113
kWh
$1,049
-
MMBtu
$589
-
lb
$3,023
-
lb
TOTAL IMPLEMENTED $3,307 $3,372 $2,291
53,634
kWh
$427
-
MMBtu
$589
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs