ITAC Assessment: IA0099
ITAC logo
ITAC Assessment: IA0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product automotive stampings
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 73,250
ft2
Annual Production 450,000
lb
Production Hrs. Annual 6,360
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,050 3,086,460
kWh
Natural Gas $25,179 5,764
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,728

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $22,684 - $22,684
390,973
kWh
- -
02 2.2437: Recover waste heat from equipment $11,414 $1,400 - $11,414
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,352 $500 $2,352
40,445
kWh
- -
04 2.4133: Use most efficient type of electric motors $8,278 $2,340 $8,278
142,732
kWh
- -
05 2.8114: Change rate schedules or other changes in utility service $4,683 - - - $4,683
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,924 $1,028 $3,924
67,702
kWh
- -
07 2.7135: Install occupancy sensors $947 $693 $947
16,413
kWh
- -
08 2.7261: Install timers and/or thermostats $1,201 $1,300 $1,034
17,878
kWh
$167
-
MMBtu
-
09 2.6212: Turn off equipment during breaks, reduce operating time $535 - $535
9,379
kWh
- -
TOTAL RECOMMENDED $56,018 $7,261 $39,754
685,522
kWh
$11,581
-
MMBtu
$4,683
TOTAL IMPLEMENTED $44,728 $4,240 $33,314
574,150
kWh
$11,414
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs