ITAC Assessment: IA0098
ITAC logo
ITAC Assessment: IA0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product cheese and whey
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 8,112
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,484 4,415,006
kWh
Natural Gas $317,446 127,082
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,957

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $5,348 $2,200 $5,348
103,751
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,661 $700 - $4,661
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $1,269 $500 - $1,269
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,334 $100 $3,334
64,771
kWh
-
05 2.7135: Install occupancy sensors $461 $135 $461
9,086
kWh
-
06 2.4133: Use most efficient type of electric motors $2,962 $2,286 $2,962
57,444
kWh
-
07 2.1213: Direct warmest air to combustion intake $698 $260 $193
3,810
kWh
$505
-
MMBtu
TOTAL RECOMMENDED $18,733 $6,181 $12,298
238,862
kWh
$6,435
-
MMBtu
TOTAL IMPLEMENTED $10,957 $3,086 $6,296