ITAC Assessment: IA0080
ITAC logo
ITAC Assessment: IA0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product industrial and impact doors
NAICS
n/a
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 200,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 2,470
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,557 1,567,995
kWh
Natural Gas $30,643 6,293
MMBtu
Fuel Oil #1 $2,514 369
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,034 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,996

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,038 $799 $3,038
54,513
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $203 $600 $203
3,517
kWh
- -
03 2.8121: Apply for tax-free status for energy purchases $2,301 $250 - - $2,301
04 2.4221: Install compressor air intakes in coolest locations $2,279 $100 - $2,279
-
MMBtu
-
05 2.7314: Reduce ventilation air $1,021 $160 $186
3,224
kWh
$835
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $192 $35 $192
3,517
kWh
- -
TOTAL RECOMMENDED $9,034 $1,944 $3,619
64,771
kWh
$3,114
-
MMBtu
$2,301
TOTAL IMPLEMENTED $5,996 $1,145 $581
10,258
kWh
$3,114
-
MMBtu
$2,301
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs