ITAC Assessment: IA0062
ITAC logo
ITAC Assessment: IA0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product poultry products
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 171,090
ft2
Annual Production 21,331
ton
Production Hrs. Annual 4,290
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,497 3,314,478
kWh
Natural Gas $81,415 16,996
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,955 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,406

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $27,024 $4,200 - - $27,024
02 2.8121: Apply for tax-free status for energy purchases $9,529 $250 - - $9,529
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,185 $100 $4,185
100,821
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,109 $1,500 $1,109
26,671
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $409 $175 $409
9,965
kWh
- -
06 2.2437: Recover waste heat from equipment $229 $486 - $229
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,922 $1,083 $1,922
46,307
kWh
- -
08 2.7135: Install occupancy sensors $1,689 $3,327 $1,689
40,739
kWh
- -
09 2.3212: Optimize plant power factor $1,859 $6,615 $1,859
-
kWh
- -
TOTAL RECOMMENDED $47,955 $17,736 $11,173
224,503
kWh
$229
-
MMBtu
$36,553
TOTAL IMPLEMENTED $34,406 $12,901 $7,153
127,492
kWh
$229
-
MMBtu
$27,024
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs