| Assessment Year | 2002 |
|---|---|
| Principal Product | metal stamping |
| NAICS |
n/a
|
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 72 |
| Plant Area |
34,000
ft2
|
| Annual Production | 2,500,000
lb
|
| Production Hrs. Annual | 3,119
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $64,860 | 1,644,480 |
kWh
|
$0.039 |
| Electricity Demand | $20,336 | 2,472 |
kW-mo/yr
|
$8.23 |
| Electricity Fees | $6,214 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $202,588 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $144,314 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,237 | $500 |
$9,058
68,038
kWh
|
$959
-
kW-mo/yr
|
$(-780.0) | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,782 | $2,200 |
$1,612
12,106
kWh
|
$170
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,630 | $5,105 |
$3,284
24,671
kWh
|
$346
-
kW-mo/yr
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $2,621 | $2,611 |
$2,333
17,546
kWh
|
$288
-
kW-mo/yr
|
- | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $3,241 | $650 |
$2,848
21,393
kWh
|
$393
-
kW-mo/yr
|
- | |
| 06 | 4.111: Add equipment/ operators to reduce production bottleneck | $17,080 | $3,200 | - | - | $17,080 | |
| 07 | 4.311: Schedule deliveries according to demand | $80,000 | $21,770 | - | - | $80,000 | |
| 08 | 4.441: Install automatic packing equipment | $3,330 | $5,000 | - | - | $3,330 | |
| 09 | 4.624: Hire additional personnel to reduce changeout time | $47,000 | $2,000 | - | - | $47,000 | |
| 10 | 4.431: Train operators for maximum operating efficiency | $34,667 | $7,348 | - | - | $34,667 | |
| TOTAL RECOMMENDED | $202,588 | $50,384 |
$19,135
143,754
kWh
|
$2,156
-
kW-mo/yr
|
$181,297 | ||
| TOTAL IMPLEMENTED | $144,314 | $37,818 |
$9,058
68,038
kWh
|
$959
-
kW-mo/yr
|
$134,297 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs