ITAC Assessment: IA0050
ITAC logo
ITAC Assessment: IA0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product cubed, crushed, and block ice
NAICS
n/a
SIC 2097: Manufactured Ice
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 150,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,455 1,350,528
kWh
Natural Gas $5,155 1,181
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,098

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $3,114 $4,500 $3,114
53,048
kWh
-
02 2.7441: Replace broken windows and/or window sash $1,319 $2,500 - $1,319
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $655 $60 $655
11,137
kWh
-
04 2.2511: Insulate bare equipment $1,872 $2,000 $1,872
31,946
kWh
-
05 2.2511: Insulate bare equipment $446 $100 - $446
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $686 $234 $686
11,723
kWh
-
07 2.2691: Shut off cooling if cold outside air will cool process $93 - - $93
-
MMBtu
TOTAL RECOMMENDED $8,185 $9,394 $6,327
107,854
kWh
$1,858
-
MMBtu
TOTAL IMPLEMENTED $2,098 $2,734 $686
11,723
kWh
$1,412
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs