ITAC Assessment: IA0049
ITAC logo
ITAC Assessment: IA0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product deli meats
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 211,000
ft2
Annual Production 150,000,000
lb
Production Hrs. Annual 5,616
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $598,088 16,658,851
kWh
Natural Gas $549,034 199,580
MMBtu
Fuel Oil #4 $248,190 134,972
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,761

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Other Energy Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,746 $11,812 - $9,746
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $26,422 $79,610 $26,422
736,225
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,833 $2,623 $5,833
162,661
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,760 $500 $3,760
104,631
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $284 $150 $284
7,913
kWh
- -
06 3.4115: Recover and reuse cooling water $15,028 $30,000 $(-5,979.0)
(-166,471)
kWh
- $21,007
-
MMBtu
TOTAL RECOMMENDED $61,073 $124,695 $30,320
844,959
kWh
$9,746
-
MMBtu
$21,007
-
MMBtu
TOTAL IMPLEMENTED $45,761 $94,545 $36,015
1,003,517
kWh
$9,746
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs