ITAC Assessment: IA0030
ITAC logo
ITAC Assessment: IA0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DIES AND STAMPINGS
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 126
Plant Area
n/a
Annual Production 500,000
lb
Production Hrs. Annual 5,538
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,145 1,598,476
kWh
Natural Gas $16,201 3,789
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,216

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7492: Use proper thickness of insulation on building envelope $9,403 $29,569 - $9,403
-
MMBtu
-
02 2.7314: Reduce ventilation air $3,352 - $1,007
24,326
kWh
$2,345
-
MMBtu
-
03 2.7231: Use radiant heater for spot heating $4,443 $12,690 - $4,443
-
MMBtu
-
04 2.7111: Reduce illumination to minimum necessary levels $4,618 $630 $4,553
109,906
kWh
- $65
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,259 $214 $2,553
61,547
kWh
- $(-294.0)
06 2.6232: Install set-back timers $1,425 $2,304 $1,425
34,291
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $169 $300 $169
4,103
kWh
- -
08 2.4133: Use most efficient type of electric motors $357 $4,230 $357
8,499
kWh
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $383 $200 $383
9,379
kWh
- -
10 2.8121: Apply for tax-free status for energy purchases $2,681 $250 $2,681
-
kWh
- -
TOTAL RECOMMENDED $29,090 $50,387 $13,128
252,051
kWh
$16,191
-
MMBtu
$(-229.0)
TOTAL IMPLEMENTED $11,216 $17,370 $4,428
42,204
kWh
$6,788
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs