| Assessment Year | 1992 |
|---|---|
| Principal Product | GRAIN DRYING SYSTEMS |
| NAICS |
n/a
|
| SIC | 3523: Farm Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
n/a
|
| Annual Production | 3,200
pieces
|
| Production Hrs. Annual | 7,280
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $42,856 | 1,036,929 |
kWh
|
$0.041 |
| Natural Gas | $33,467 | 8,073 |
MMBtu
|
$4.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,638 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,413 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,172 | $50 |
$6,172
148,886
kWh
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,350 | $30 |
$1,350
32,532
kWh
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $1,129 | $200 | - |
$1,129
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,132 | $126 |
$1,258
30,481
kWh
|
- | $(-126.0) | |
| 05 | 2.6232: Install set-back timers | $474 | $1,431 |
$474
11,430
kWh
|
- | - | |
| 06 | 2.6232: Install set-back timers | $318 | - |
$318
7,620
kWh
|
- | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $63 | $26 |
$63
1,465
kWh
|
- | - | |
| TOTAL RECOMMENDED | $10,638 | $1,863 |
$9,635
232,414
kWh
|
$1,129
-
MMBtu
|
$(-126.0) | ||
| TOTAL IMPLEMENTED | $1,413 | $56 |
$1,413
33,997
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs