ITAC Assessment: IA0016
ITAC logo
ITAC Assessment: IA0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BOAT TRAILERS
NAICS
n/a
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 62,400
pieces
Production Hrs. Annual 3,200
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,201 3,307,737
kWh
Natural Gas $125,997 35,911
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7229: Air condition only space necessary $38,385 $29,200 $(-523.0)
(-11,137)
kWh
$38,908
-
MMBtu
-
02 2.2424: Use heat in flue gases to preheat products or materials $10,600 $30,400 - $10,600
-
MMBtu
-
03 2.7226: Use computer programs to optimize hvac performance $2,252 $4,400 $2,252
48,066
kWh
- -
04 2.2511: Insulate bare equipment $116 $120 - $116
-
MMBtu
-
05 2.2437: Recover waste heat from equipment $2,678 $500 - $2,678
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,791 $1,200 $2,791
59,496
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $976 $50 $976
20,809
kWh
- -
08 2.7141: Lower light fixtures in high ceiling areas $8,044 $3,150 $8,044
171,454
kWh
- -
09 2.7111: Reduce illumination to minimum necessary levels $2,342 $390 $2,342
49,824
kWh
- -
10 2.6232: Install set-back timers $236 $120 $236
4,982
kWh
- -
11 2.7111: Reduce illumination to minimum necessary levels $298 $305 $298
6,448
kWh
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $(-86.0) $79 $74
1,465
kWh
- $(-160.0)
13 2.4133: Use most efficient type of electric motors $205 $3,574 $205
4,396
kWh
- -
TOTAL RECOMMENDED $68,837 $73,488 $16,695
355,803
kWh
$52,302
-
MMBtu
$(-160.0)
TOTAL IMPLEMENTED $45,147 $34,918 $6,399
136,283
kWh
$38,908
-
MMBtu
$(-160.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs