ITAC Assessment: IA0010
ITAC logo
ITAC Assessment: IA0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SPORT SOCKS
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 600,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,562 2,428,781
kWh
Natural Gas $72,698 20,636
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,183

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $6,926 $5,950 - $6,926
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,004 - $3,988
94,080
kWh
- $(-984.0)
03 2.4133: Use most efficient type of electric motors $679 $2,792 $679
15,826
kWh
- -
04 2.7261: Install timers and/or thermostats $574 $450 - $574
-
MMBtu
-
TOTAL RECOMMENDED $11,183 $9,192 $4,667
109,906
kWh
$7,500
-
MMBtu
$(-984.0)
TOTAL IMPLEMENTED $11,183 $9,192 $4,667
109,906
kWh
$7,500
-
MMBtu
$(-984.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs